Lisagallon on behalf of SSE Renewables was responsible for supply, installation, termination and commissioning of a double 33kV circuit underground cable from Glenconway 33kV Substation to the grid connection location at Slieve Kirk wind farm. The project in total contained the ducting and installation of 120,000m for 630mm sq. AL cable together with all the associated works.